---
title: WHITTLE CONSULTING CASE STUDY – IVANHOE, PLATREEF
description: Whittle Consulting Case Study - Ivanhoe Platreef project, Platinum, Underground, South Africa. Enterprise Optimisation study resulting in significant NPV increase.
---

[Latest News from Whittle Consulting](https://latestnews.whittleconsulting.com.au)

# [WHITTLE CONSULTING CASE STUDY – IVANHOE, PLATREEF](https://latestnews.whittleconsulting.com.au/whittle-consulting-case-study-ivanhoe-platreef)

 Written by [Whittle Consulting](https://latestnews.whittleconsulting.com.au/author/whittle-consulting) | Jun 16, 2022 3:30:00 AM

 

The best way to explain the benefits of the [Whittle Integrated Strategic Mine Planning](https://www.whittleconsulting.com.au/integrated-strategic-planning/) approach is to look at examples of our project work. Since 1999, [Whittle Consulting](https://www.whittleconsulting.com.au/) has a proven track record in mining optimisation and mine planning with many of the largest mining companies around the world, undertaken across all commodities and in all continents.

[Whittle Enterprise Optimisation studies](https://www.whittleconsulting.com.au/integrated-strategic-planning/#mechanisms) have consistently proven to significantly enhance the economics of mining projects and operations. The full effects of a Whittle Optimisation can be extraordinary. Whittle Consulting regularly achieves NPV increases from 5%-35%, and in many cases substantially more. These improvements to mine valuation occur even when other conventional mine optimisation techniques have already been applied. The [Ivanhoe, Platreef project](https://www.whittleconsulting.com.au/codeless_portfolio/ivanhoe-platreef/) is an excellent example of the benefits we provide to our clients.

#### IVANHOE, PLATREEF – PLATINUM, SOUTH AFRICA

Whittle Consulting conducted a commercially-orientated review of the pre-feasibility study designs and cost estimates of the Platreef, followed by a value chain mine optimisation and sustainability study. Although the results cannot be disclosed, they were financially significant to overall mine valuation. Revenue and cashflow were brought forward, NPV was significantly enhanced and the location of the most profitable ore body in the South African project was determined.

*“Despite lower metal prices used in the definitive feasibility study compared to the 2015 pre-feasibility study, we have maintained the excellent economics of the Platreef Project due, in part, to the mine optimisation work completed with assistance from industry-leading experts, such as Whittle Consulting of Melbourne, Australia. Even at today’s spot metal prices, the Platreef Project would generate an operating margin in excess of 40%.”* Robert Friedland, Executive Chairman, Ivanhoe Mines.

[READ](https://www.whittleconsulting.com.au/codeless_portfolio/ivanhoe-platreef/)CASE STUDY

#### Want to learn more about the Whittle Integrated Strategic Planning approach to Mine Optimisation?

- Watch our 10 minute video - [What is Integrated Strategic Planning](https://www.whittleconsulting.com.au/what-is-integrated-strategic-planning/) - a high level overview of our approach and the methodologies applied to maximise the value of mining operations & projects worldwide
- Download a recording of our [45 minute Introductory WEBINAR -](https://info.whittleconsulting.com.au/lp-whittle-consulting-45-minute-webinar?hs_preview=QRusNBfc-58104890723)a conceptual overview of the Whittle Consulting philosophy and methodology and explains what is covered if you attend our online Whittle Integrated Strategic Mine Planning seminar
- Attend a [Whittle Integrated Strategic Mine Planning SEMINAR](https://www.whittleconsulting.com.au/seminar/), delivered online over 4-half days in a live & interactive format

[View full post](https://latestnews.whittleconsulting.com.au/whittle-consulting-case-study-ivanhoe-platreef)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Whittle Consulting"
  },
  "dateModified" : "2024-06-13T01:10:25.727Z",
  "datePublished" : "2022-06-16T03:30:00Z",
  "headline" : "WHITTLE CONSULTING CASE STUDY – IVANHOE, PLATREEF",
  "image" : {
    "@type" : "ImageObject",
    "height" : 455,
    "url" : "https://5165350.fs1.hubspotusercontent-na1.net/hubfs/5165350/Ivanhoe-1.jpg",
    "width" : 721
  },
  "mainEntityOfPage" : "https://latestnews.whittleconsulting.com.au/whittle-consulting-case-study-ivanhoe-platreef",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60.0,
      "url" : "https://f.hubspotusercontent00.net/hubfs/5165350/Logos/Screen%20Shot%202020-11-12%20at%204.45.50%20pm.png",
      "width" : 60.0
    },
    "name" : "Latest News"
  }
}
```