APPLICATION OF ENTERPRISE OPTIMISATION CONSIDERING GREEN GOLD TECHNOLOGIES PTD LTD’S RECYN™ PROCESS

APPLICATION OF ENTERPRISE OPTIMISATION CONSIDERING GREEN GOLD TECHNOLOGIES PTD LTD’S RECYN™ PROCESS

 

Whittle Consulting is proud to be at the cutting edge of enterprise optimisation in the mining industry. Here we share some of our most interesting developments in technology, process and optimisation outcomes.

Introducing the ReCYN process

The ReCYN™ process (‘ReCYN’) by Green Gold Technologies Pte Ltd (‘Greengold’ / GGT) is a worldleading approach in cyanide recovery, metal recovery and tailings detoxification. Based on an innovative resin-bead absorbent, ReCYN™ reduces cyanide consumption by 50%, capturing free cyanide from the plant tailings and recycling it back into the leach circuit while recovering metal complexes and making them available for sale. In the process, ReCYN™ detoxifies the tailings stream and guarantees 100%-compliant clean water discharge. ReCYN™ is efficient, economical and environmentally friendly. It is the only cost-saving innovation of its kind that is generating results today on an industrial scale. 

The brief to Whittle Consulting
Whittle Consulting Pty Ltd (WCPL) worked with PT Agincourt Resources (PTAR) to assess the value benefits of incorporating the ReCYN™ process into the existing processing plant at the Martabe gold / silver operation in Sumatra, Indonesia. This was the final stage of a wide-ranging Enterprise Optimisation (EO) suite of work with PTAR on the Martabe operation, based on the 2016 reserves. 

The work conducted by Whittle Consulting
Subsequent to this EO work, further drilling and exploration work has led to a substantial uplift in both reserves ounces and mine life at Martabe. A fully optimised comparable case using the current Martabe processing setup (without the ReCYN™ process) was developed. This utilised strategic pit shell designs developed using Dassault Systèmes’ GEOVIA Whittle™ pit optimisation software (GEOVIA Whittle™) and optimised in Whittle Consulting’s Prober® software (completed as ‘Base Case Optimised Plan’). This is already a highly optimised Base Case, calibrated using Whittle Consulting’s EO philosophy and techniques. This includes Activity-Based Costing (ABC) and utilises Theory of Constraints (TOC), on Pits and Phase optimisation in GEOVIA Whittle™. Whittle Consulting’s proprietary software, Prober®, was then employed to calibrate schedule, cut-off, stockpile and blending to maximise net value through the constraint of the operation – in this case, Mill hours (as a proxy for power usage).

The operational results achieved by Whittle Consulting
This approach allows valuation on true constraints, rather than processed tonnes. This means ore feed tonnage realistically flexes, depending on the grind size used and the hardness of the ore feed. The notional value implications of incorporating the ReCYN™ process into these base case designs and schedule was then calculated. This was demonstrated using a four-stage static analysis on the schedule outcomes (i.e. no change to mining schedule, cut-off or destination), revaluing progressively on: 

  • Recovering Cyanide and re-using in CIL; 
  • Reducing Detoxification costs; 
  • Intensifying Cyanide usage to increase Silver recovery; and
  • The ReCYN™ ability to creating a new copper cathode product via electrowinning  

The financial impacts achieved by Whittle Consulting
To demonstrate the benefit of conducting a full Whittle Consulting Enterprise Optimisation for a material change such as adding ReCYN™, an end-to-end full re-optimisation using the ReCYN™ outcome was conducted. 

New strategic pit shell designs were developed for all four main sites at Martabe and were then optimised in WCPL’s Prober® optimiser as ‘ReCYN™ Optimised Plan.’ Included in the ReCYN™ NPV calculations for both the initial ‘Static Analysis’ step and the ‘ReCYN™ Optimised Plan’ is a US$5M 2018 capex charge for the installation of the ReCYN™ treatment plant and all opex as appropriate for each step. This does not include a royalty to Greengold that may be applicable at other projects. All results were optimised with Gold at US$1,300 / ounce, Silver at US$19 / ounce and ReCYN™ Case Study – Martabe Operations 3 US$6,061 / tonnes per payable tonne of Copper (97% of recovered Copper assumed payable; price based on US$2.75/lb).

ACCESS the full Technical Paper

Want to learn more about the Whittle Integrated Strategic Planning approach to Mine Optimisation?
  • Download a recording of our 45 minute Introductory WEBINAR - a conceptual overview of the Whittle Consulting philosophy and methodology and explains what is covered if you attend our online Whittle Integrated Strategic Mine Planning seminar.

  • Attend a Whittle Integrated Strategic Mine Planning SEMINAR, delivered online over 4-half days in a live & interactive format.

  • View our CASE STUDIES and PAPERS

  • Watch our Services Timeframe VIDEO - an outline of the recommended sequence of interaction with Whittle Consulting. The 12-minute video details the services offered by Whittle Consulting and the typical delivery timeframe achieved for clients.